Childcare Center Onsite Wastewater System

Fairview, NC
Onsite Wastewater System

The Childcare Center is a day care facility for 115 children. They were having septic field failure from the original facility installation and they needed to expand their capacity by 25%. BEA engineering an aerobic pretreatment and drip dispersal drainfield system for them to get the repair system to fit in the available space. The system was design, permitted and approved in an expedited time frame due to health concerns. The new system is operating effectively and mitigating the high nitrogen effluent loading.